Skip to main content

Volvo EC330B Display ECU MDU

This illustration show Volvo EC330B Display ECU MDU.

Volvo EC360B Display ECU MDU

MDU(Machine Display Unit)
This animation is to show you how to operate display unit.
Push the arrow button step by step.

Volvo PROSIS 2019
If the key is ON position, all lamps are ON for one second and then engine speed and work-mode are displayed. By pushing arrow button, display contents are changed from engine speed to battery voltage, hammer operating hour, key number, pump flow rate and error code.

2022 Volvo PTT Premium Tech Tool PTT 2.8.130/2.7 & 2.6
When pump flow rate is selected, if you push the arrow button for 5 second, the unit of flow will be changed between lpm and gpm.
When error code is selected, active error codes are displayed consecutively.
If pump flow rate (option) is changed, set value is displayed on main display window for 10 seconds.


Comments

Popular posts from this blog

Volvo EC330B Excavator Battery Relay & Safety start Relay

Volvo EC330B Excavator Battery Relay & Safety start Relay Battery relay This is main relay for electric system. Volvo PTT Techtool 2.8.130 The relay turns the battery current ON or OFF, according to low power signals received from the start switch. Use of the relay permits the start switch to control the power of the batteries with a small capacity wire. When you replace this component, pay attention to the +/- signs on the relay. Wrong connection can cause early failure of relay. 2. Safety start relay When trying to restart the engine while the engine is running, or if the start switch is in the START position after the engine is activated, the relay cuts off the current to the starter motor to protect it.

Volvo EC330B Excavator Electronic Control System Overview

Volvo ECB330B Excavator Electronic control system overview   Volvo ECB330B Electronic control system is composed of various computers and its communication line. In our system, 2 computer (EECU, VECU) is programmable and 1 computer (MDU) is not. Volvo Tech Tool Communication is important thing to control the machine properly. We use two communication lines that is international protocol. The line is twisted to protect the bus from electrical interference.

Volvo EC330B Excavator Engine Start and Stop Circuit Old Overview

Volvo EC330B Excavator Engine Start and Stop Circuit Old Overview  Volvo PTT Procedures: Engine Start and Stop Circuit(Old) Power from battery => electric greasing system,start key,start motor,battery relay Power from battery relay =>safety start relay Vocom 88890300 1) Key ON  BR=> Battery relay,alternator(15,pre-magnetization)  ACC=>VECU,Air conditioner,EMS power relay 2) Key Start  R2=> VECU  C=> safety start relay 3) Engine running  Alternator(L)=>hour meter,safety start relay,VECU(charge lamp off)  * Resistor between alternator and BR termainal for quick charge lamp off  Alternator(B+)=>alternator(BS,voltage sensing for regulation)  Alternator(15)=>battery relay 4) Key Off  VECU(JA61)=>battery relay