This manual show you guide on how to remove and install superstructure for Volvo EC210B excavators.The superstructure is heavy. Pay attention to safe footing and the area around the crane before proceeding to remove or install the superstructure.
Related Contents:
Volvo PTT Diagnostic software free download
Volvo PROSIS 2019 EPC+Service Manual Free Download
Volvo EC210B Excavator Superstructure Removal
Weight of superstructure : 4 ~ 7 tons excluding counterweight and digging unit.
1.1. Remove the digging unit.it.
2.2. Disconnect center passage clamping screw, seal cover, hydraulic oil hoses, drain hose, and one servo hydraulic oil hose from center passage.
NOTE!
Bundle the hoses. Blind plug each disconnected hose and pipe.
3. Remove screws (A) fixing the outer race of the slew ring.ng.
4.4. Dismantle the cab, counterweight and guard. Place a wire rope on the superstructure and lift it with a crane to anan extent that the wire rope is not slack.
5.5. Lift the superstructure just a little, and after confirming safety all around, lift it up and out.
Volvo EC210B Excavator Superstructure Installation
1.1. Bundle the hoses attached to the center passage together and place them upright.ht.
2.2. Coat the screws and threaded holes of the slew ring with "Threebond kk 1215" (Loctite #515)
3
3. Lift the superstructure and install it to the slew ring.
NOTE!
Lower the superstructure so that the slew pinion and the slew ring are engaged.
NOTE!
For tightening torque, see torque chart.
NOTE!
Tighten diagonally opposite screws in sequence.
4.4. Connect the hoses, center passage clamping screw and seal cover disconnected for removal.
https://www.autoepccatalog.com/product/volvo-ptt-devtool-acpi-plus-installation-activation-service/
Comments
Post a Comment